Price: Contact
Acrylic Resurfacer is a 100% acrylic latex emulsion designed for onsite mixing with silica sand and water.
5 Gallon Pail, 30 Gallon Keg, 55 gallon Drum
Yield calculations are based on undiluted gallons of SportMaster Acrylic Resurfacer and will vary according to surface texture and porosity within the limits below:
.07 to .09 gallons per square yard per coat.
Pavement surface must be cleaned entirely of dust, dirt, debris and all loose materials. New asphalt must cure 14 to 28 days before application. Repair of pavement surface defects, depressions and cracks must be completed prior to application. All repairs must be flush and smooth to adjoining surfaces.
For Patching and filling depressions, Acrylic Resurfacer With Sand may be modified with sand and cement using the following mix design:
For applying patch mix, you’ll need a straight edge or screed bar (Metal, wooden, aluminum, etc.) that is wider than the depression area that will be patched. Apply large amount of patch material at one end of the depression and use the straight edge to screed and smooth material across the depression. Feather the edges of the patch material with a hand trowel or squeegee to assure a smooth patch. Allow patch to cure 24 hours. If shrinkage cracks occur when patch dries, simply apply another coat of patch mix with a squeegee. This will fill in and eliminate shrinkage cracks. Once patch mix has thoroughly cured (at least 24 hours) sanding or grinding may be required to provide a smooth patch finish.
When applying Acrylic Resurfacer with Sand as a coating, use the following mix design:
Apply Acrylic Resurfacer With Sand as a coating using a soft rubber squeegee. Allow to dry. Scrape all rough spots and ridges before applying the next coat. Apply one or two coats, depending on surface porosity and condition. Two coats are recommended on new or uncoated asphalt.
Apply mixed Acrylic Resurfacer with Sand with a soft rubber squeegee. Scrape all rough spots and ridges before applying successive coats. Allow Acrylic Resurfacer with Sand to dry completely before applying additional coats.
Temperature must be above 50ºF both during application and for a period of at least 24 hours after application.
30 to 60 minutes under optimum drying conditions.
Wash tools in water before material dries.